The facility is designed in the classic SLS style, with a total area of 1036m². What's inside? In addition to the SLS elements, it features the first concrete pumptrack in Poland.
The skatepark, measuring 774 m², also features a bowl in addition to street elements. The pumptrack, measuring 261 m², is designed in the SLS style, with a strong street focus. The pumptrack, with its classic loop shape, has been enhanced with an additional section with a miniramp (140 cm) connecting to Barcelona on one side. Additionally, the center section features a satellite ramp (135 cm) for practicing shallower turns and a Vulcano. The entire track is lined with Nipples, making it highly dynamic and enhancing its functionality.
Update: The skatepark and pumptrack officially opened on April 13, 2024.