When we received the order from the Jaworzno City Council, we had 2185m2 of space available. In the initial design phase , public consultations were organized, during which the demands of the local community emerged. The most important elements were to be the large Street section and the Bowl, which was to remain open on one side due to the lack of any possibility of drainage other than gravity.
The centerpiece of the Street section is a platform that directs us to several possible lines of travel and long walls with different angles of descent, so that different grind/slide options can be practiced.
The Bowl was designed with "surfers" in mind who will be able to enjoy varying tapers, heights or the angles themselves. The finishing touch, and the crossover, is a rare element that requires an innovative approach in design, the large, sloping Dome.
The entire facility is prepared with the possibility of holding competitions in mind.